← Blog

How to Make a Calendar in Google Sheets With Formulas

Updated

Build a monthly calendar in Google Sheets step by step with DATE and WEEKDAY, add rows for notes, grey out other months, then print it on one page.

You want a calendar in Google Sheets that you can actually write in. The tutorials you found either have you typing 1 to 31 by hand, or paste in a formula nobody explains, and then you can't type in the boxes without breaking it.

Here is how to make a calendar in Google Sheets for one month, with two short formulas you can read and a row under every week for notes. Change one cell and it redraws for any month. At the end I'll cover what to do when one month isn't enough.

TL;DR

  • Two formulas build a full month grid that redraws when you change the month or year cell.
  • Keep dates and notes in separate rows, because typing over a formula cell deletes the formula.
  • Most people type the dates by hand, and then every month after January needs rebuilding from scratch.

Who this is for

  • Office Administrator: builds a room booking or staff rota grid that resets each month.
  • Teacher: makes a classroom month calendar to print and fill with homework and test dates.
  • Freelance Designer: lays out client deadlines for the month without paying for another app.
  • Bookkeeper: needs a month grid to mark payroll, invoicing and filing days.
  • Student: wants a printable month for assignments that fits in a binder.

Step 1: set up the year and month cells

Open a blank sheet. Type Year in A1 and 2027 in B1. Type Month in A2 and 1 in B2 for January.

Every formula below reads from B1 and B2, so these are the only cells you ever change.

In row 4, type the weekday names across A4 to G4: Sun, Mon, Tue, Wed, Thu, Fri, Sat.

Step 2: find the first Sunday and fill the first week

A month grid starts on the Sunday on or before the 1st. Click A5 and paste:

=DATE($B$1,$B$2,1)-WEEKDAY(DATE($B$1,$B$2,1))+1

  • DATE($B$1,$B$2,1) is the 1st of the month.
  • WEEKDAY() returns 1 for Sunday up to 7 for Saturday. That is the default numbering in Google Sheets.
  • Subtracting it and adding 1 walks back to Sunday. January 1, 2027 is a Friday, so the grid starts on Sunday, December 27, 2026.

You'll see 46383 in the cell. That is how Sheets stores December 27, 2026 as a number. Select row 5 and go to Format > Number > Custom number format, type d, and it shows 27.

In B5 type =A5+1, then drag the fill handle across to G5. You now have the first week: 27, 28, 29, 30, 31, 1, 2.

Step 3: add the other weeks with a notes row under each

If you fill the whole grid with dates, there's nowhere to write. Typing into a cell that holds a formula replaces the formula, so the notes need their own rows.

  1. Leave row 6 empty. That is the notes row for week one.
  2. In A7 type =A5+7 and drag it across to G7. That is week two, starting Sunday, January 3.
  3. Copy A7:G7 and paste it into A9, A11, A13 and A15. Each row adds 7 to the row two above it, so you get six weeks of dates with an empty row under each one.
  4. Apply the d format to the new date rows too.
  5. Select rows 6, 8, 10, 12, 14 and 16, right-click, choose Resize rows, and make them about 80 pixels tall. Turn on Format > Wrapping > Wrap so longer notes stay inside the box.

Six weeks covers every possible month. A month that starts on a Saturday and has 31 days, like January 2028 will, needs all six.

Step 4: grey out other months, shade weekends, print

Select A5:G16 and open Format > Conditional formatting. Under "Format cells if", choose Custom formula is and enter:

=AND(ISNUMBER(A5),MONTH(A5)<>$B$2)

Set the text color to light grey. The December and February days at the edges now fade back. The ISNUMBER part keeps the rule off your notes rows.

For weekends you don't need a formula. Columns A and G are Sunday and Saturday, so give both a light fill color and the date and notes rows shade together.

Add a title in D1 with =TEXT(DATE(B1,B2,1),"mmmm yyyy") so the header reads January 2027. Then go to File > Print, pick Landscape, set the scale to fit the page, and untick gridlines under Formatting.

To see another month, change B2 to any number from 1 to 12. Everything else moves with it.

When one month isn't enough

This grid answers "what's happening in March?" It can't show you whether March, April and May are all packed while August sits empty. For that you need all 12 months on one page.

You could repeat this build 12 times on one tab, but that is where I'd stop and copy Big Year. It's free, it has the whole of 2027 on one page with weekends highlighted, and the DOWNLOAD tab prints it as a landscape PDF on Letter, A4, Tabloid or A3 in one click.

Keep your month sheet for the detail, and put the trips, deadlines and holidays on the year view first.

Holidays that recalculate when the year changes

Fixed-date holidays are easy: on your Holidays tab, Christmas is =DATE(Calendar!$B$1,12,25), assuming your calendar tab is called Calendar. Change the year and it follows.

Floating holidays need a little more. Thanksgiving in the US is the fourth Thursday of November:

=DATE(Y,11,1)+MOD(5-WEEKDAY(DATE(Y,11,1)),7)+21

Replace Y with your year cell. The MOD part finds the first Thursday, and +21 jumps three weeks. For 2027 it returns November 25. Martin Luther King Jr. Day, the third Monday of January, follows the same pattern: =DATE(Y,1,1)+MOD(2-WEEKDAY(DATE(Y,1,1)),7)+14 gives January 18, 2027.

Highlight them with the INDIRECT rule in the FAQ below, and add =A5=TODAY() as a second rule with a bold border so today stands out.

Common pitfalls

  • Typing dates by hand. They don't move when the month changes. Use the formula in A5 and build every other date from it.
  • Typing notes into date cells. That deletes the formula and breaks every week below it. Write in the notes rows only.
  • Forgetting the custom number format. Without it you see numbers like 46383. Format each date row as d.
  • Only building five weeks. Some months need six rows. Keep the sixth row even when it's grey.

FAQ

How do I add holidays to this calendar?

List the dates on a tab called Holidays, then add a conditional formatting rule like =COUNTIF(INDIRECT("Holidays!A2:A40"),A5)>0. Conditional formatting can only see another tab through INDIRECT.

How do I start the week on Monday instead?

Change the headers to Mon through Sun and use =DATE($B$1,$B$2,1)-WEEKDAY(DATE($B$1,$B$2,1),2)+1 in A5. Type 2 counts Monday as 1. Then shade columns F and G for the weekend.

How do I make the calendar change months automatically?

Put =MONTH(TODAY()) in B2 and =YEAR(TODAY()) in B1. The grid then always shows the current month, but notes you typed stay in their cells, so keep one copy per month you want to save.

Can I print a Google Sheets calendar on one page?

Yes. In File > Print choose Landscape and fit to page, and untick gridlines if you want a clean look.

Planning next year? Get the Big Year, a free 2027 calendar in Google Sheets.

Keep reading

Ads keep the free stuff free. Members browse ad-free — log in or see pricing.
Big Year 2027 calendar: the whole year on one Google Sheet

Free 2027 calendar.Plan all of 2027 on one Google Sheet, free.

Copy it to your Google Drive.

Free. No password, no card. The sheet link shows up right here.